
In brief
- Since July 2020, shipments have been governed by Royal Decree 553/2020, which repealed Royal Decree 180/2015.
- You need a treatment contract, prior notification and an identification document.
- If the waste is dangerous goods, the ADR transport documentation is added.
- In Catalonia the paperwork is processed electronically, through the document system of the Agència de Residus.
The three shipment documents
- Treatment contract. A prior agreement between whoever hands over the waste and the waste manager that is going to treat it. It is mandatory for any shipment.
- Prior notification. For hazardous waste and waste intended for disposal, the authorities are notified at least ten days in advance.
- Identification document. It accompanies each movement, from loading to receipt at the plant.
And for transport
Much hazardous waste is also dangerous goods. In that case, transport requires a transport document, instructions in writing, approved packaging and labels in accordance with ADR. Companies that load or consign these goods must have a dangerous goods safety adviser (DGSA).
What Ivalore does and what you do
We prepare the contract, process the notification and the identification document, and give you the labels and the ADR documentation. You have to keep the documents and record each outgoing consignment in your chronological record. In the customer area you can download an annual report of the quantities managed for your declarations.
A note about our previous website
In 2016 we published several posts about Royal Decree 180/2015. That regulation is no longer in force: this article replaces them.
More articles
Regulations · 11 Nov 2026Changes in waste legislation in 2026: what your company needs to know
New waste register, digital shipments, packaging regulation and new by-products: the regulatory changes of 2026 that affect your company.
Read →
Sludge · 10 Nov 2026Sludge rejected by landfill because of moisture: what your options are
Why a landfill rejects sludge with too much water and what the producer can do: drying, stabilisation or recovery.
Read →
Guides · 4 Nov 2026How to choose a waste manager: 6 things you should check
Authorisation, own facility, recovery and documentation: six things you should check before hiring a waste manager.
Read →Would you like to know what managing your waste will cost?
Tell us what waste you produce and we will send you a no-obligation proposal.
- Reply within 24 hours
- No-obligation quote
- Waste manager authorised by the Catalan Waste Agency (E-993.07)
Prefer to talk to us? +34 972 11 80 74