Changes in waste legislation in 2026: what your company needs to know
Law 7/2022 on waste continues to be developed, and 2026 has brought significant changes at national and European level. We review the four developments most likely to affect companies that generate, ship or manage waste, and what is worth checking in each case.

1. New Register of waste production and management (Royal Decree 764/2026)
Published in the BOE on 1 October 2026 and in force since the following day, this royal decree regulates the national register listing all waste producers, managers, carriers, brokers and dealers.
The key points:
- The information is organised on three levels: the entity (identified by its NIF), the site (identified by its NIMA, a ten-digit number) and each registration according to the type of activity.
- There are different types of registration for hazardous and non-hazardous waste. For example, small producers of hazardous waste (less than 10 tonnes a year) have a type of their own.
- The autonomous communities have until 2 October 2027 to adapt their databases.
What to check: that the details of your company and of each site (NIMA, activity, waste codes) are correct and up to date in the register of your autonomous community.
2. Shipments of waste between countries: mandatory digitalisation
Regulation (EU) 2024/1157 on shipments of waste has applied in full since 21 May 2026. The main change is that the documentation for international shipments must be handled electronically. Shipments subject to prior notification must be processed through the European DIWASS system, and shipments subject to general information requirements will move to this system from 1 January 2027.
What to check: if your company sends waste to or receives waste from other countries, make sure that you or your waste manager are registered in DIWASS and are familiar with the new procedure.
3. New European Packaging Regulation (PPWR)
Regulation (EU) 2025/40 on packaging and packaging waste has been generally applicable since 12 August 2026, and in Spain it coexists with the compatible parts of Royal Decree 1055/2022. One of the most significant changes is that it extends the concept of packaging to transport packaging: pallets, boxes, film, strapping and other protective items.
This means that some companies that import or receive goods from other countries may now be regarded as producers of that packaging, with extended responsibility obligations: registration in the register of producers, declaration of quantities and financing of the management of the waste. The quantities placed on the market from 13 August to 31 December 2026 must be declared.
What to check: what packaging accompanies the goods you place on the market and whether your company now has obligations as a producer.
4. Newly declared by-products (Order TED/202/2026)
A ministerial order has been in force since 1 July 2026 declaring certain industrial materials to be by-products, and not waste, when they are intended for a specific use. They include aluminium-saturated sodium hydroxide from anodising, artificial gypsum from the production of electrolytic copper and virgin wood offcuts for manufacturing boards.
To make use of this status, the producer must submit a responsible declaration to its autonomous community and keep a record of quantities and destinations for five years. If the conditions are not met, the material is once again regarded as waste.
What to check: if your company generates any of these materials, consider whether you can manage it as a by-product and what requirements you must meet.
The regulations are changing: don't get left behind
Keeping up to date with environmental regulations takes time and technical knowledge. At Ivalore, as well as managing and recovering your waste as a waste manager authorised by the Agència de Residus de Catalunya (E-993.07), our environmental advice department helps you to interpret regulatory changes and adapt your company to them.
More articles
Sludge · 10 Nov 2026Sludge rejected by landfill because of moisture: what your options are
Why a landfill rejects sludge with too much water and what the producer can do: drying, stabilisation or recovery.
Read →
Guides · 4 Nov 2026How to choose a waste manager: 6 things you should check
Authorisation, own facility, recovery and documentation: six things you should check before hiring a waste manager.
Read →
Obligations · 3 Nov 2026How long can I store hazardous waste at my company?
Maximum periods for storing waste at the place of production under Law 7/2022 and how to avoid exceeding them.
Read →Would you like to know what managing your waste will cost?
Tell us what waste you produce and we will send you a no-obligation proposal.
- Reply within 24 hours
- No-obligation quote
- Waste manager authorised by the Catalan Waste Agency (E-993.07)
Prefer to talk to us? +34 972 11 80 74